JP Rentals

Structure · Steel

Industrial steel and cladding nationwide

We support every project from design through site erection—bringing technical accountability, schedule discipline, and the documentation each client requires. Our work spans warehouses, roofs, façades, and structural upgrades across Mexico.

+30

Years of experience

20K

Tons installed

+70

Team members

About us

Steel and cladding at national scale

We deliver projects with business sense, technical precision, and operational discipline. Our approach combines engineering, fabrication, and erection for high-impact work with demanding standards for quality, safety, and schedule.

More than contractors, we are a strategic partner for organizations that need solid results on real timelines. That is why industrial companies across Mexico choose JP Rentals for their most critical structural projects.

End-to-end process

Five stages, one continuous workflow

We run an integrated process that covers the full project lifecycle—from engineering and design through final field finishes—with compliance, safety, and quality control at every step.

Steel frame under erection—engineering and field reference

STAGE 01

Engineering

Design that gets built

Every project starts with custom design using Tekla Structures and AutoCAD. Our drawings align with Mexican industry codes and international standards to support safe, buildable execution on site.

  • Structural engineering Loads, connections, and member design.
  • Erection drawings Details for on-site assembly and installation.
  • Technical reviews Coordination with architecture and MEP.
  • Calculation packages Complete documentation for delivery.
Structural progress on site—fabrication reference

STAGE 02

Fabrication

Industrial precision

Our shop combines advanced equipment with skilled teams to turn steel into durable structures. We use certified materials and controlled processes from layout through fitting and assembly.

  • Cutting and fitting Oxy-fuel, plasma, and laser cutting.
  • Certified welding AWS-qualified welders.
  • Quality control Visual and dimensional inspection.
  • Traceability Each piece identified and documented.
Steel erection inside an industrial shell

STAGE 03

Erection

Safe, precise installation

Our erection crews work to strict safety protocols on site. We have experience with industrial buildings, warehouses, mezzanines, office structures, and special steel work at any scale.

  • Industrial buildings Supply, fabrication, and erection.
  • Mezzanines and intermediate floors Solutions within existing spaces.
  • Site safety STPS compliance and field protocols.
  • Logistics coordination Scheduling aligned with the client.
Roof and wall cladding over structural steel

STAGE 04

Cladding

We cover the full envelope

We install metal roof and wall systems tailored to site conditions and performance needs for daylighting and insulation. We work with leading brands and profiles recognized in the market.

  • KR-18 sheeting Common standard for industrial roofs.
  • R-101 panels High-performance alternative.
  • Translucent panels Natural daylighting where required.
  • Fiberglass insulation Thermal and acoustic comfort.
  • Losacero Structural mezzanine deck system.
Coating and envelope finishes on industrial structure

STAGE 05

Coating

Protection that lasts

We apply coating systems matched to each project’s operating environment—from anti-corrosion primer and durable topcoats to hot-dip galvanizing and epoxy or polyurethane systems for severe exposure conditions.

  • Anti-corrosion primer Base protection against rust.
  • Hot-dip galvanizing Full coverage for high-exposure conditions.
  • Epoxy and polyurethane Chemical and UV resistance for long service life.
  • Custom finish Color and coating matched to environment and client.

Projects

2026 · Coca-Cola (Arca Continental)

Freight roof

Floor area
3,500 m²
Structural steel
370 t
Location
Monterrey, N.L.

Supply, fabrication, and erection of the steel frame in the freight area; KR-18 roof deck; R101 wall panels on façade and counter-façade.

2026 · Kandelium

Cladding (scaling & packing)

Floor area
9,500 m²
Structural steel
435 t
Location
García highway area, N.L.

Fabrication and erection; KR-18 roof and R101 wall panels.

2025 · Motomex (CEDIS II) — Nave Kontar II

CEDIS II — structure & cladding

Floor area
15,400 m²
Structural steel
580 t
Location
WTC La Pila Industrial Park, San Luis Potosí

Supply, fabrication, and erection; KR-18 roof and R101 façades.

2024 · Nave Mod 4

Multi-tenant building

Floor area
5,800 m²
Structural steel
280 t
Location
Guadalupe, N.L.

Fabrication and erection of the multi-tenant warehouse frame.

2023 · Hoffsan Industrial Park (Daye project)

Warehouse & mezzanines

Floor area
7,950 m²
Structural steel
330 t
Location
Salinas Victoria, N.L.

Erection of the main building, office mezzanines, and Losacero 15 mezzanine decking.

2025 · Motomex (CEDIS I)

CEDIS I — structure & cladding

Floor area
3,800 m²
Structural steel
150 t
Location
WTC La Pila Industrial Park, San Luis Potosí

Supply, fabrication, and erection; KR-18 roof and R101 façades.

Our services

Industrial warehouse steel frame under erection: trusses and bracing.

Structure

Assisted design, detailing, fabrication, and erection with QC for warehouses and industry.

View service
Metal roof and wall cladding over an industrial steel frame.

Sheeting & envelope

Commercial profiles (e.g. KR-18), wall and façade R panels or as per design, closed out on site.

View service
Structural work inside an existing warehouse shell.

Strengthening & mezzanines

Work on existing buildings, mezzanines, Losacero and adjustments with minimal disruption.

View service

Grupo Nasacero

The same standards for execution, fabrication, and quality control, with complementary capabilities across the group.

Let's build together

Offices

Anastacio Bustamante 1030 / 1048 Poniente

Bella Vista, Monterrey, N.L.

C.P. 64410

Open in Google Maps